If your roof in Lavenham has failed and a replacement is on the way, knowing what to do in the meantime - and what not to do yourself - can prevent a bad situation from getting worse.
Call any time. Calls are answered day and night and passed straight to our roofers.
Roof problems rarely happen at a convenient moment. You notice the leak on a Saturday night in January, or spot slipped tiles the morning after a storm. A full roof replacement in Lavenham means stripping back to the rafters, checking the timbers, fitting a new membrane and battens, and re-covering in slate or tiles - and that job needs to be planned, scaffolded and carried out properly. There may be a short wait before work can start, and what you do during that period matters.
The guidance below is for the period between identifying the problem and the roofer arriving on site. It is not a substitute for calling a professional promptly - but it covers the practical steps you can take to limit damage and keep your home liveable while you wait.
If water is actively entering the roof space or coming through a ceiling, the priority is to limit how far it spreads. Place containers to catch dripping water and protect anything below - particularly electrics, light fittings, and anything stored in the loft that you do not want soaked. If water is near a light fitting or you can hear it dripping inside a ceiling void, switch off the circuit that serves those lights at the consumer unit. Water and live fittings are a serious risk.
In the loft, you can place a sheet of heavy polythene or a tarpaulin over any stored items and tuck it under any beams to help channel water to one point rather than letting it spread across the ceiling below. This is temporary measure only - it does not fix anything but it limits the secondary damage.
When a roof is clearly failing, the instinct to do something active is understandable. But some of the things that seem helpful can make the job harder, more expensive, or genuinely dangerous.
In some situations a roofer may apply a temporary fix to hold the roof until a full replacement can be scheduled. This might be a tarpaulin fixed across the affected area, a temporary patch of new felt over a small exposed section, or re-fixing a displaced tile with a clout nail to stop it sliding further. These are professional applications done from scaffold or proper access equipment - they are temporary by design and clearly understood to be so.
If a contractor offers to put a tarpaulin over the problem area as a short-term measure while the replacement is planned, that is reasonable and accepted practice. What you should not accept is someone who offers a tarpaulin as a long-term solution, or who suggests this can substitute for the replacement work your roof clearly needs.
While you wait for the replacement, keep a close eye on the affected areas inside. Damp ceilings can develop quickly and, if ignored, can result in plasterboard that has to be replaced as well as the roof above it. If a ceiling is visibly bulging or sagging with trapped water, keep everyone out of the room and do not poke, prod or pierce it - it can come down suddenly if a large volume of water collects.
Check whether any insulation in the loft has become wet. Soaked mineral wool or loose-fill insulation loses its thermal properties and does not recover fully when it dries out. It also holds moisture against the timbers above it, which accelerates deterioration. Wet insulation should be removed and replaced as part of the roofing job, not left in place and dried out.
When the roofer does arrive to begin work, here is what a properly run roof replacement looks like. The scaffold goes up first to give safe working access. The existing covering - tiles or slates, battens, and old roofing felt - is stripped off completely and taken to a skip. The exposed timbers are then inspected carefully: rafters, wall plates, purlins and any other structural members are checked for rot, softness, cracking or insect damage. Any timber that is not sound is replaced or reinforced before anything goes back on.
A new breathable membrane is then laid over the rafters, overlapping correctly at every joint and tucked into the eaves. Breathable membrane allows moisture vapour from inside the house to escape while preventing wind-driven rain from entering - it is a significant improvement over the original black felt fitted on most older properties. New treated timber battens are fixed over the membrane at the correct spacing (called the gauge) for the tile or slate being laid.
The new covering is then fixed from eaves to ridge - slates are nailed directly to the battens, while tiles are hooked over the batten and nailed at specific intervals depending on pitch and exposure. The ridge is either bedded in mortar or fitted with a dry-ridge mechanical system. Leadwork at valleys, chimneys and abutments is replaced or re-dressed. Finally, the verge and eave details are made good before the scaffold comes down.
Roof replacement costs vary depending on roof area, pitch, the material specified and any structural work needed once the timbers are exposed. As a general guide, a full replacement on a typical semi-detached or detached property in Suffolk costs in the region of £5,500 to £15,000. Natural slate is at the higher end of the cost range but is the longest-lasting option. Reconstituted slate is a cost-effective alternative. Concrete interlocking tiles are generally the most affordable covering material and suit a wide range of property types.
The material on your existing roof does not have to dictate the replacement - though in conservation areas or on listed properties, planning considerations may restrict what you can use. If you are unsure whether your property in Lavenham has any restrictions, check with the local planning authority before committing to a material that may require consent.
A replacement is the most practical time to deal with any skylights that are misted, leaking at their upstands, or difficult to open. Fitting or replacing a skylight while the scaffold is up costs far less in access charges than doing it separately. The same applies to leadwork on chimney stacks and at valleys, and to any rotten fascia boards or blocked guttering. Grouping this work together avoids paying for scaffold a second time.
We cover Lavenham and the surrounding villages from our base in Bury St Edmunds. If your roof needs urgent attention, call us to arrange an inspection - we will assess the situation honestly and tell you what needs doing and in what order.